Ships Marine Facility Ship Tech Support Schedules General Info. Contacts Site Map
Home >> Ships >> Melville >> Support Equipment
EQUIPMENT LOCATION SWL (At Sea) NOTES
Allied Heavy Crane Top of Aft staging bay 5,000 lbs. Trawl/Dredge Capable
Pettibone Crane 02 level amidships 1,800 lbs.  
Stern A-frame Stern centered 14,000 lbs.  
Stbd A-frame Stbd side 20,000 lbs.  
Stbd J-frame Stbd side aft of fwd hanger 1,500 lbs.  
Portable Cranes Various Various Contact MarFac for Info
Instrument Wells 1 – 01 level 28" dia. Tube
2 – Fantail, 28" dia. Tube
   
Workboat     Foam collar boat
Mooring Capstan Main Deck Aft   Moveable
Uncontaminated Seawater Portside Labs    
Seismic Air Compressor. Trawl Winch Room   1,850 psi.
Deck Boltdowns All decks and Labs   2’x2’ pattern
Stern Ramp. Stern centered   12’ wide
Center Well Inboard Stbd A-frame   6.5’ x 5.5’
Bow Observation Chamber Below waterline at bow    
Cargo Hoist Fwd end of Main Lab   4’ x4’
Overhead Hoists Both staging bays    

Winches
TYPE CABLE NOTES
Northern Line Traction Drum 10,000 m 3x19, 9/16" Trawl
10,000 m .680" EM
Wires on two drums. Can carry trawl wire on both drums. Stern A-frame
Northern Line Hydrographic 7,600 m 3x19 _" Wire led to Stbd J-frame
Markey DESH-6 10,000 m .322" EM Wire led to Stbd A-frame
Markey DESH-5 CTD 10,000 m .322" EM Wire led to Stbd A-frame
SOMTS Home Ships Marine Facility Ship Tech Support Schedules General Info. Contacts Site Map
Ship Scheduling
9500 Gilman Drive, La Jolla, CA 92093-0210
Telephone: (858) 534-2840
Fax: (858) 822-5811
shipsked@ucsd.edu