![]() |
![]() |
|||||||
|
|
||||||||
| Home >> Ships >> Revelle >> Support Equipment |
|
|
Support Equipment
|
|||||
| EQUIPMENT | LOCATION | SWL (At Sea) | NOTES | |||
| North America Heavy Crane | Main Deck Starboard Quarter | 5,000 lbs. | Trawl/Dredge Capable | |||
| North America Heavy Crane | 01 Level Port Frame | 5,000 lbs. | ||||
| HIAB Crane | Main Deck Port Quarter | 2,000 lb. | Relocatable | |||
| HIAB Crane | 02 Level forward | 2,000 lb. | Relocatable | |||
| A-Frame | Stern Centered | 18,000 lb. | ||||
| Hydro Boom | Starboard Side Frame | Provision for 3 Sheaves | ||||
| Portable Cranes | Various | Contact MarFac for Info | ||||
| Mooring Capstain | Main Deck Aft | Relocatable | ||||
| Instrument Well | Staging Bay | 24" Dia | ||||
| Workboat | 21' RIB | |||||
| Uncontaminated Seawater | All Labs | |||||
| Seismic Air Compressors | Engine Room | 2 Compressors 2,000 PSI | ||||
| Deck Boltdowns | Main/01/02 Decks, All Labs | |||||
Winches |
||||||
| TYPE | CABLE | NOTES | ||||
| Markey DUTW 9-11 Traction | 15,000 M 3x19 9/16" Trawl | |||||
| 10,000 m .680 EM or F/0 | F/O Over Stern Only | |||||
| Markey DESH 5 | 10,000 m .322 CTD | Can be configured as Hydro | ||||
| Markey DESH-5 | 10,000 m 3x19 1/4" Hydro | Can be configured as CTD | ||||
| Portable | Various Sizes and Lengths | Contact MarFac for Information | ||||
|
|
||||||
|
Ship Scheduling
9500 Gilman Drive, La Jolla, CA 92093-0210 Telephone: (858) 534-2840 Fax: (858) 822-5811 shipsked@ucsd.edu |